Met my carpenter at the boat and removed the main hatch and the two wooden slides. Top of the new hatch will be made of solid mahogany. Should be ready to install before we launch. Flood level now at
The new wire for the forestay has been installed by Sailcrafters on 4/13. We now have 100% new standing rigging. Sent the new spreaders to have the holes drilled and the endplates bolted on. Need to r
8 April 2023 Spring has arrived. Waiting to see if the Mississippi River floods at the Lake City Marina. Temps in the 80's next week. Time to fix the name plate and bow plates. Need to finish the rebu