Captitan Tiburon
New Main Hatch
Met my carpenter at the boat and removed the main hatch and the two wooden slides.
Top of the new hatch will be made of solid mahogany. Should be ready to install before
we launch. Flood level now at moderate at 19 ft. Projected to peak on Tuesday, April 25
at 19.7 ft. 20 ft level is considered major flooding. Hoping to launch the week of May 8th.